Skip to content Skip to sidebar Skip to footer

This floor took us over a year to finish | How to lay a limecrete floor timelapse

The limecrete floor is finally done! Since we started digging out the ground floor back in July 2021 we’ve moved over 100m3 of material and installed all the layers of the new floor, including the underfloor heating.

This is not your typical slab floor. There’s no cement and it uses natural building materials as much as possible: natural hydraulic lime, expanded clay aggregate, cork insulation and sand.

Watch in fast forward as we show you the whole process from start to finish including a couple of small delays along the way.

Join the Conversation

Become a member to chat to us and other members about all sorts of fascinating topics.

JOIN THE CLUB

MAKE. DO. GROW. © 2024. All Rights Reserved.

Choose Your Preferred Currency

 
Join the CLUB for £9.99 per month
OR
£99.99 per year (15% saving)