Skip to content Skip to sidebar Skip to footer

The FINAL Layer! – DIY Limecrete Floor (Part 4)

This limecrete floor project has been months in the making. From removing the old concrete to digging down over 40cm to filling everything back in with a combination of geotextile, LECA, natural hydraulic lime (NHL 5) and installing the underfloor heating pipework; we’re finally ready for the last layer.

The plan was to show one big timelapse of laying the rest of the floor. But of course, things don’t always go to plan.

Let’s see how we get on as we move one step closer to finishing this epic project.

Join the Conversation

Become a member to chat to us and other members about all sorts of fascinating topics.

JOIN THE CLUB

MAKE. DO. GROW. © 2024. All Rights Reserved.

Choose Your Preferred Currency

 
Join the CLUB for £9.99 per month
OR
£99.99 per year (15% saving)